久久综合香蕉久久久久久久,亚洲国产美女精品久久,久久久久久久999,久久久精品久久

Design & Tooling

Automotive Mould E-catalogue
I'm on line,contact now.

Production Process
Home?>>? Design & Tooling?>>? Production Process

The quality goes in before the name goes on
1. Mould manufacture standard documents will be done by Engineering Dept an we will have a meeting for the new mould.
2. Mould design: 3D,2D drawing designed according to customers' requests and standards.
3. After mould design confirmed, We will order the steel and mould base tooling. In the meantime, sending customer the tooling & processing schedule.
4. Mould components purchasing and preparation. 
5. Sending the mould situation to customer by photos weekly. QC Dept following the mould processing schedule closely, controlling the mould quality strictly.
6. Checking the mould: polishing,texture, waterline and so on.
7. Assembling.
8. Mould first testing,checking the part dimension, and work out the inspection report documents.
9. Sending the samples and inspection report to customer
10. Customer instruction & confirmation for shipment.

巫山县| 高阳县| 南城县| 宜川县| 利川市| 崇信县| 南安市| 和静县| 井冈山市| 巴南区| 安乡县| 开江县| 北宁市| 梨树县| 遂昌县| 新余市| 崇左市| 普格县| 枝江市| 海门市| 余干县| 襄汾县| 随州市| 汽车| 新干县| 尼勒克县| 项城市| 三门峡市| 宁德市| 宝鸡市| 绍兴市| 会东县| 玉田县| 内乡县| 荔波县| 珠海市| 澄江县| 额尔古纳市| 闽侯县| 蚌埠市| 龙口市|