久久综合香蕉久久久久久久,亚洲国产美女精品久久,久久久久久久999,久久久精品久久

Design & Tooling

Automotive Mould E-catalogue
I'm on line,contact now.

Production Process
Home?>>? Design & Tooling?>>? Production Process

The quality goes in before the name goes on
1. Mould manufacture standard documents will be done by Engineering Dept an we will have a meeting for the new mould.
2. Mould design: 3D,2D drawing designed according to customers' requests and standards.
3. After mould design confirmed, We will order the steel and mould base tooling. In the meantime, sending customer the tooling & processing schedule.
4. Mould components purchasing and preparation. 
5. Sending the mould situation to customer by photos weekly. QC Dept following the mould processing schedule closely, controlling the mould quality strictly.
6. Checking the mould: polishing,texture, waterline and so on.
7. Assembling.
8. Mould first testing,checking the part dimension, and work out the inspection report documents.
9. Sending the samples and inspection report to customer
10. Customer instruction & confirmation for shipment.

织金县| 桃江县| 萝北县| 怀柔区| 化德县| 金塔县| 应用必备| 鹤壁市| 井陉县| 峡江县| 铁岭县| 丰宁| 昌黎县| 平谷区| 区。| 论坛| 沁阳市| 泗水县| 咸阳市| 平顺县| 乐至县| 手游| 湾仔区| 旅游| 黄梅县| 大足县| 定安县| 桦甸市| 军事| 双江| 虎林市| 偏关县| 苍梧县| 周宁县| 高台县| 抚宁县| 揭西县| 巨野县| 边坝县| 九江市| 鄂托克前旗|